Project 674-11
Sheeting Removal & Replacement
Cleveland, OH
Great Lakes constructed approximately 200 feet of failed bulkhead along the Cuyahoga River. Since the Cuyahoga River is the lifeline for raw materials coming into the plant, a costly river shut down could not be tolerated; therefore, the failed bulkhead was removed and replaced during the winter months when river traffic was significantly reduced.