Project 926-16
Cleveland, OH
Atlantic Aviation Taxiway / Ramp construction commenced in early spring of 2017 and was substantially completed by the end of July. The rehabilitation of the ramp includes full-depth concrete replacement, joint repair, new drainage, asphalt overlays and pavement markings. The project Operations Team was very creative in utilizing many different paving methods and equipment to meet the owner’s schedule.