Project 241-20
Beta Hillcrest Solar Substation
Mount Orab, OH
Great Lakes was contracted to perform structural concrete and trenching for a new substation in southwest Ohio. The substation was built to distribute power from a new solar field generating 200 MW to the power grid. This is enough power to support 200,000 homes. The entire project footprint was larger than 1,300 acres.
.