ODOT Project 3000-16 Cleveland, OH The Opportunity Corridor Project (informally referred to as OC2) was the second major project to be constructed from Opportunity Corridor…
Project 709-13,Shippingport, PA In a design-build venture with URS, Great Lakes constructed this 40,000 SF training facility at the Beaver Valley Nuclear Power Plant. Our…
Project 572-07FIRST ENERGY/BECHTEL POWER CORP.Stratton, OH Great Lakes Construction continued their participation in an air quality control project at the Sammis Electric Generation Plant in…
Project 3001-08Columbus, OH This Design-Build project consisted of five sound absorptive noise barriers along I-71 Northbound in Columbus, OH. The walls total over 170,000 square…
Project 3017-10 Ashtabula, OH This Design-Build project made improvements to three bridges located over IR-90 in Ashtabula County. One structure called for the existing bridge…
Project 674-11 Sheeting Removal & Replacement Cleveland, OH Great Lakes constructed approximately 200 feet of failed bulkhead along the Cuyahoga River. Since the Cuyahoga River…
ODOT Project 3000-13 Cleveland, OH The new Eastbound George V. Voinovich Bridge, carrying Interstate I-90 traffic over the Cuyahoga River Valley into downtown Cleveland, was…
Project 671-11 5th Street Bridge Replacement Niles, OH Great Lakes constructed the 5th Street Bridge over the CSX railroad. The new bridge is a be…