Project 188-19 Cameron WV When The Great Lakes Construction Co. was presented with this project in late spring 2019, the compounding challenges seemed nearly insurmountable.…
Project 188-19 Cameron, WV Scope of work included substation mass earthwork. Approximately 50,000 CY of rock was drilled and blasted to bring the pad to…
Project 238-20 Massillon, OH This greenfield substation and transmission line add-on involved importing 2,500 CY of fill material for the station pad, installation of drilled…
Project 93-18 Butler County, OH Great Lakes performed the civil scope of work for a fuel oil system installation at a gas-fired power plant. Our…
Project 79-18 Cleveland, OH Owned by Cuyahoga County, the MetroHealth System (MHS) is a non-profit health care system that provides health care to many residents…
Project 65-18 Wheeling, WV Continuing our work on the region’s electrical grid, Great Lakes performed earthwork and foundation installation for a switch station expansion near…
Project 9-17 Cleveland, OH The Great Lakes Construction Co. was at the Cleveland Clinic for the new Health Education Campus (a new state-of-the-art medical college…
Project 46-18 Moundsville, WV Project scope included 400 LF of duct bank.
Project 947-17 Jackson, TN Great Lakes portion of work included installing a 120’ Redi-Rock retaining wall and site drainage including manholes and headwalls.
Project 825-15 Cleveland, OH The Cleveland Clinic Ring Bus Project – located on the main campus of the Cleveland Clinic – spanned from E. 86th Street…