Project 418-22 City of Lakewood Site Development Lakewood, OH In downtown Lakewood, the famous Facebook “Pit” is finally being developed. The site used to be…
Project 412-22 Great Lakes Brewing Co. Scranton Peninsula Cleveland, OH Remediation and site preparation got underway for the Great Lakes Brewing Co. Carter Road Project…
Project 357-21 Mentor Marsh Salt Fill Remediation Project Mentor, OH The Mentor Marsh is one of the largest natural marshes that remains along Lake Erie.…
Project 662-11KENERSYS/LINCOLN ELECTRICEuclid, OH Build a foundation and erect a 2.5 MW wind turbine generator at Lincoln Electric’s Euclid, Ohio facility. The 278’ tower will…
Project 241-20 Beta Hillcrest Solar Substation Mount Orab, OH Great Lakes was contracted to perform structural concrete and trenching for a new substation in southwest…
Often referred to as “clean energy”, renewable energy is derived from natural sources that are continuously replenished. The resources are virtually inexhaustible but limited in…
Project 76-18 Fremont, OH In 1913, the Ballville Dam was constructed on the Sandusky River for the purpose of generating hydroelectric power. The dam, located…
PROJECT 830-15 Lakewood, OH The City of Lakewood selected The Great Lakes Construction Co. to build Solstice Steps, which feature an upper and lower promenade…
Project 824-15 Cleveland, OH This pilot project seeks to reduce the cost of traditional dredging operations by installing proprietary sediment-collecting equipment into the Cuyahoga River.…
Project 645-10NORTHEAST OHIO REGIONAL SEWER DISTRICTEuclid, OH The project included removal of a dam, installation of gabions and rock channel protection, restoration and wetlands plantings.