Project 991-17
Richmond Heights, OH
Major work activities on this fast-tracked project included over 200,000 CY of offsite excavation, 45,000 Tons of P-209 aggregate base, 18,500 Tons of new asphalt taxiway/runways, installation of two EMAS beds, runway/taxiway lighting and navigation aids.
EMAS (Engineered Materials Arresting System) are utilized to reduce the risk associated with overrun off the end of a runway.)